3) What is PDCA Cycle?
Answer Posted / mahendra
The PDCA life cycle is method used for fixing the problem
with namely four stage
Plan->Do->Check->Act
First stage you plan what is the solution->Do the required
changes->Check if desire result are achieved?->Analyze the
result->Act accordingly to move towards problem solved state.
This is used for continuous improvement by following PDCA
cycle repeatedly till you achieve desire result.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Why is software testing required?
HI, This question is Investment Banking domain related Question. I was asked in an Interview to tell the 5 test cases for Equity,Bond,Futures and options. Please help.. Pragya
what are the risks and contingencies u had in ur project?
What is actually a rule based testing
In what situation would you want to parameterize a text verification check?
Can Anbody please send me Daily Work status format in which I can save my daily work activity
how can we do database testing. In database testing we verify the data integrity and data validation. how can we do testing of Index, triggers, views, ransactions,cursors etc
I have 2 yrs 10 months experience in manual testing. there is a gap of 3 yrs in between. just 3 months before i rejoined the same company. I am looking for new & better job.What I have to enhance my career to up level, should I have to do Automation course or any other. Guide me properly.
How can I done a Web Testing? Which steps are include in it?
What type of metrics would you use?
During alpha testing why customer people are invited?
What type of questions will be asking for 2 years experience candidate in manual testing?
what are your thoughts on SPRINT duration
which of the following is not a coding defect? Option 1 Test harness defect Option 2 Data flow defect Option 3 Initialisation defect Option 4 Algorithmic defect
how can u prepare the test plan?