HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / shahnawaz
simply find out the volume of concreting area i;e LXBXH
orD=we will get the volume say cum (m3)
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What Are The Different Type Of Slump Test Indications?
Explain what are the skills required to become an architect?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
Describe the role of independent Quantity surveyor?
Questions related to civil.engg in company
What is meant by scaffolding coefficient?
What is meant by Crystal Concrete?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
what is differences between ferrock and concrete ?
what is relation between SPT N value and driving piles after conducting a soil test?
how to conversation of all construction material in to brass
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?