why primer application is required before applying putty

Answer Posted / kumars

THE ABOVE ANSWER ARE OK. PUTTY WE ARE APPLYING MIX WITH PUTTY POWER & LEQUIDENT LIKE WATER OR WATER BASE, IF WE ARE APLLYING TO DIRCTLY TO PLASTED SURFACE IT WILL ABSORB THE WATER CONTENT IN PUTTY ,THEN WE CAN'T GET SMOOTH FINISH IT WILL LIKE A DRY POWDER, SO FOR THAT REASON WE ARE APLLYING PRIMER AS BASE COAT BEFORE APLLYING PUTTY.


BY KUMAR

Is This Answer Correct ?    11 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

1227


Define the various stages of the project planning process in construction.

667


what is the Asfalt test?in road constraction..?

1658


What is the difference between yeild strength and compressive strength of steel???

1806


"Gates of the dams are generally designed of curved shape". Why?

1611






How to calculate the crank rod in slab

1913


on what basis the partial factor of safety are decided? form the load combinations

1817


Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?

1579


What is meant by Crystal Concrete?

1281


How to calculate laplength for 3 floors

1357


Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?

1697


What is the quantity of cement in mix m20 concrete?

708


) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2266


what is escalation?how it is done?

2112


Slab quantity 

1618