how to calculate cement bag in RCC
Answer Posted / rajib pathak
HOW TO CONVERT CUMIC METER INTO M.SUPPOSE 8 CUBIC METER OF RCC COST YOU Rs 2400.so how much im cost?
Is This Answer Correct ? | 30 Yes | 13 No |
Post New Answer View All Answers
how much cement and sand required for 100sqm of wall plastering in different proportions
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Difference between pre-tensioning and post-tensioning.
What is difference between engineering stress and true stress?
How many % we consider for lap for reinforcement for estimates
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
Explain the various stages of the project planning process in construction?
What materials were used to build the golden gate bridge?
what is diversion?
what is the specific gravity of rubble in plum concert
What is the difference between one-way slab and two-way slab?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
how to calculate load bearing column
In a concrete grade C35A, C & A stands for what and equalent cube strength?
dialation means