Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the exact meaning for under & over reinforced beams
& when they have to used..

Answer Posted / abhinay barla

when the permissible stress is less than the maximum permissible value then it is said to be under reinforced section/beam.

when the permissible stress is grater than the maximum permissible value then it is said to be over reinforced section/beam.

when the permissible stress is equal to the maximum permissible value then it is said to be balanced reinforced section/beam.

Is This Answer Correct ?    39 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions

2336


how we calculate the vol.of wet concrete..?

1899


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

2254


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1822


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1768


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

2001


What are the strongest shapes in building?

1150


I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs

2564


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

2493


how many litres of enamel paint required for 5000 sft of site?? 

1942


Explain what is the difference between built area and super built up area?

1208


What are the responsibilities of a site manager?

1142


What is meant by engineering drawing?

1073


What is the diff between cad & cadd?

1196


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

2375