What is the exact meaning for under & over reinforced beams
& when they have to used..
Answer Posted / abhinay barla
when the permissible stress is less than the maximum permissible value then it is said to be under reinforced section/beam.
when the permissible stress is grater than the maximum permissible value then it is said to be over reinforced section/beam.
when the permissible stress is equal to the maximum permissible value then it is said to be balanced reinforced section/beam.
| Is This Answer Correct ? | 39 Yes | 8 No |
Post New Answer View All Answers
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
how we calculate the vol.of wet concrete..?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
What are the strongest shapes in building?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
how many litres of enamel paint required for 5000 sft of site??
Explain what is the difference between built area and super built up area?
What are the responsibilities of a site manager?
What is meant by engineering drawing?
What is the diff between cad & cadd?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?