Answer Posted / tushar patel
AS per IS:456-2000,Concrete grade above M25 has to be
designed mix.for such higher grade W/C ratio,quality of
aggregates,admixtures are equaliy important parameters.So
M30 can never be designed in volumetric batching if
consistent quality control & strength is desired.
Is This Answer Correct ? | 29 Yes | 4 No |
Post New Answer View All Answers
What are the advantages and disadvantages of lead products in construction?
what is the difference between prime coat and tack coat in road construction
how to calculate weight of 1.8 cum of aggregate
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
Technical Question of Civil Engineering
How to calculate unit weight of concrete for m40 grade.
how can we construct building without foundation providing only grade beam at ground level
How to calculate construction cost of residential building in mumbai
what is anchorage length,lap length and (dont remember the last one)
at which depth the construction of tunnel is economical from cost and engineering aspect.
how we can find sieve #4 is 4.75mm?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Explain the mechanism of cavitations in pipes and drains?
Explain what is the difference between built area and super built up area?