how can we calculate the cutting length of 10,12,16,20 and
so on iron bars for 45 digree and 90 digree bents plz tell
me if there is any formula or tabel to find it
Answer Posted / deepak
1)for 90 degree bend 3/4of D
D=depth of the structure
2) for 45 degree use pythagars theorm
Is This Answer Correct ? | 12 Yes | 11 No |
Post New Answer View All Answers
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What is the distance between railway tracks?
punj loyed and sapurjl palanjl
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
may i know the detailed description of cutting length
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Why are separation membranes used between concrete pavement slab and sub-base?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.