what is tmc ,term is used in measureing water, pls tell me 1
tmc = how many litres?
Answer Posted / subhash chandra sekar . e
TMC = Thousand million cubic feet
1TMC= 27000 million liter of water or 2700 core liter of
water
Plz u r sarch google u get full detail about it
Is This Answer Correct ? | 107 Yes | 46 No |
Post New Answer View All Answers
What is thumb rule in quality and quantity estimation of a Residential building??
afe or not
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
What is the difference between shear and tensile strength?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
What is made from large rocks, which protects the base of cliffs?
What is hybrid foundation?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
how statics is different from dynamics
will fix foundation bolts at site with out template is there any procedure?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.