cement consumption per square feet in multi storeyed
building
Answer Posted / javed shaikh
0.35 bags per sq ft for RCC work & 0.45 bags per sq ft
including RCC & Finishing work
Is This Answer Correct ? | 48 Yes | 11 No |
Post New Answer View All Answers
what are the Task work of different labour.?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
How to calculate the load of partion in flat slab if we use brick?
What is the difference between one-way slab and two-way slab?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
Explain different types of rcc pipes.
what are the code used for residental building?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
I am called for interview from north east power plant .so, I need some interview question which may help me.
how much of the strength comes from post-production curing
what is the design procedure for building
How many are the types of joints?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Define What is the difference between routing maintenance and major maintenance in school facilities?