I am applying for vizag steel plant management recruitment
for 2009 please can anybody send me the pattern of the
written test paper

Answer Posted / lee

Hi,
I have contacted the steel Plant management.
The pattern goes like this
100 qns--Aptitude
60 qns--Techical

Duration 2 to 2 1/2 hrs

Questions Number may change.

Is This Answer Correct ?    24 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Alok and Bhanu play the following min-max game. Given the expression N = X - Y – Z where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be • 4 • -18 • 9 • 2

2160


If the ratio of the areas of 2 queres is 2:1, then the ratio of the perimeters of the squares is

729


in a railway station, there are tow trains going. One in the harbour line and one in the main line, each having a frequency of 10 minutes. the main line service starts at 5 o'clock. the harbour line starts at 5.02a.m. a man goes to the station every day to catch the first train. what is the probability of man catching the first train

805


f(X)= f(X-1)+f(X-2) FOR X>1 THEN X= ?

815


If A=Z, B=Y, C=X, .......... Z=A, Then GROUP = ?

667






There are 1997 doors in the courts. 1997 people came out from each door. One door is closed. That many people came out from each door. This continues till a single person come out of the single open door. Find the no of people inside the court?

775


in a question ,last part has, the ages of two people has the ratio of 6:6 and by adding the numbers we get 44, after how many years the ratio would be 8:7?

840


The cost of one pencil, two pens and four erasers is Rs.22 while the cost of five pencils, four pens and two erasers is Rs.32.How much will three pencils, three pens and three erasers cost?

724


Find the next number in the series 0,3,8,15,,24,48,63--

714


Ajay can build a house in 16 days and Barry can do the same job in 12 days. With help of Chintu, they did the job in 4 days only. How many days Chintu can do the job?

969


A student gets 70% in one subject, 80% in the other. To get an overall of 75% how much should get in third subject.

755


A can have a piece of work done in 8 days, B can work three times faster than the A, C can work five times faster than A. How many days will they take to do the work together ?

735


'X' liters of petrol can be filled in an automobiles tank. What part of full tank was removed, if 'Y' liters was removed when the tank was full?

693


Complete the series..2 2 12 12 30 30 ?

757


In a soap company a soap is manufactured with 11 parts. For making one soap you will get 1 part as scrap. At the end of the day u have 251 such scraps. From that how many soaps can be manufactured?

864