Answer Posted / mallikarjun
total there are si phases in test life cycle system
1)test planning
2)test design
3)test execution
4)result analysis
5)bug tracking
6)report analysis
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Describe your personal software development process.
What’s the difference between verification and validation in testing?
what is mean by impact analysis ,how we used to select regression TC using this?
Test approach to windows scheduler?
What is defect validity ratio?
How quickly we need to fix the bug? Or how soon the bug should get fixed?
Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2
What is Pre UAT and UAT is there any difference ?
3. In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed at 40%. To the nearest whole pound, which of these groups of numbers fall into three DIFFERENT equivalence classes?
Which are the different tests for apparel testing?
What is stub?
What's the difference between system testing and acceptance testing?
How do you get programmers to build testability support into their code?
What is a failure?
in an online banking software,users are connecting to bankserver by login.This login module can take below inputs for user. a/c number prefix-3 digits but doesnot start with 0&1 a/c number sufix-6 digits number password-5to 10 chars alphanumerics in lowercase areacode-3 digits number but optional purpose- cheque deposit money trasfer mini statement bills pay After filling above fields,user can click submit button to connect to bank server.prepare test scenarios for online banking s/w login.