What is Entry and Exit criteria for a Test Plan?
Answer Posted / shailu
Entry criteria:
1)All source codes are unit tested
2)All QA resource has enought functional knowledge
3)H/W and s/w are in place
4)Test plans and test cases are reviewed and signed off
Exit criteria:
1)No defect over a perod of time or testing effort
2)Planned deliverables are ready
3)High severity defects are fixed
Is This Answer Correct ? | 32 Yes | 13 No |
Post New Answer View All Answers
What is criticality?
Why is the decision table testing used?
i am a PG science(chemistry),now am working test engineer in small organization,now i will decide to move better organization please send model cv and advises
What is JBOD?
What are environment variables and explain the use of the same.
What is execution?
In practice, which life cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and system integration testing after system testing.
Testing methodology and when do you start testing activity?
What documents will you need to create a test case?
give an example of unit test and integration test and system test and UAT test?
Which testing method is used to check the software in abnormal condition?
what is the difference between 8.2 and 9.2 versions of qtp tool
Describe your ideal working environment.
Which review is normally used to evaluate a product to determine its suitability for the intended use and to identify discrepancies?
What is functional system testing?