What is Entry and Exit criteria for a Test Plan?
Answer Posted / shailu
Entry criteria:
1)All source codes are unit tested
2)All QA resource has enought functional knowledge
3)H/W and s/w are in place
4)Test plans and test cases are reviewed and signed off
Exit criteria:
1)No defect over a perod of time or testing effort
2)Planned deliverables are ready
3)High severity defects are fixed
| Is This Answer Correct ? | 32 Yes | 13 No |
Post New Answer View All Answers
When should 'regression testing' be performed?
What r SQA activities?
Suggest some good webinars on Testing concepts?
What is software fault?
Explain what is 'test plan driven' or 'key word driven' method of testing?
In which order should tests be run?
What is software verification?
What is a test configuration manager?
what is the meaning of Field Level Validation & Form Level Validation??
Have you performed tests on the front-end and the back-end?
What is upward compression?
What is path analysis?
plz give me any body some 3top UAT test cases, Advance thanks?
What is software risk?
What can static analysis not find?