Risk Analysis :
A systematic use of available information to determine how
often specified events and unspecified events may occur and
the magnitude of their likely consequences
OR
procedure to identify threats & vulnerabilities, analyze
them to ascertain the exposures, and highlight how the
impact can be eliminated or reduced
Types :
1.QUANTITATIVE RISK ANALYSIS
2.QUALITATIVE RISK ANALYSIS
Is This Answer Correct ? | 3 Yes | 0 No |
What is the difference between bug,error,defect.
What are the different ways to check a date field in a website?
Can anybody explain about Mercury Quality Center " Dashboard tab" and its usage. Thanks in advance
if the interviewer asked what are thec hallenges did u face in ur project how should we answer in project point of view and as well as testing technical point of view plzzz send the answer i faced this question lot of times but i am unable to expose correctly plz send the answer how to say plzzzzzzzzzzzzz
As a manager what process did you adopt to define testing policy?
what is the defference between stress and load testing?
Do you feel any dis-advantage over the current process? if he/she says any, have You discussed with your Manager reg this ? Why?
Login screen with Username, Password input fields,remember me check box,sign in and reset button write Test Cases for GUI, Funcitonal, Negative, Usability and Security testing.
Hello Friends,I want some clearence regarding. Test report and Final report.
what is test coverage?
How to write gui test cases ? plz gve me some sugessition about gui test cases along with examples plz plz any one plz
can u tell me what is orthogonal array testing?