Answer / rohit dhingra
for this we need the given concrete grade as for m20.
calculate volume in cum = 1x0.2 = 0.2 cum
for m20 multiply with 8.064 for cement = 1.61 cement bags
sand = 0.42x0.2 = 0.084 cum
aggregate = 0.84x0.2 = 0.168 cum
Is This Answer Correct ? | 2 Yes | 6 No |
how much quantity of cement,sand and water required for 1 sq feet flooring work .
what r you reqired for concrete baching plant?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Rigid pavement Load in tyre preesure It Means KG
How many mortar required for Brickwork of 1 Cu.m works??
what are the diffrent kind of grades in concrete and what does M means while specifyng the grades?
How to calculate the length of chairs provided to support the top rebar in concrete foundation
what is the meaning of morth
In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
12 Answers CMR, Modi Builders, Taehwa Enterprises, vvip,
List out the potential risk factors for workers on the construction site?
I am constructing a house having 20' X 19' hall. Do I need to go for a concealed beam. any alternative please? Thanks if a design is provided.
1- what is steel rebar cover? 2- what is a rebar stirrup?