Answer / ahmed assem
PLCis a device which makes control on machines,DCS is a
system not a device which makes you mentoring what the
controllers are doing and it allows you to control
it.(that's in a simple way)
Is This Answer Correct ? | 14 Yes | 4 No |
Answer / kesavan
PLC MEANS PROGRAMMING LOGIC COTROL
DCS MEANS DISTRIBUTED CONTROL SYSTEM
Is This Answer Correct ? | 10 Yes | 2 No |
Answer / bhaveshsavaliya
As we define PLC as programmable logic control,it has some
limitation related to its features like limitation of its
input/outputs,No.of Analog/digital interface and many other
which are applicable for only one particular application.
While DCS is also a control used for same application as
PLC,but when it Comes to your applications,you must know
difference between this ,For Example Like mega Power plant
or big capacity Refinery,where multiple task where
controlling at same time, which could not possible via
PLC,but we have to make mass communication between such PLC
modules which controlling such different task and give
feedback to masters,this will then define as Distributed
control system and make a huge task possible without any
Complication,consumption and failure.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / arumugam
PLC is a Controller in which used to operate the
mechanical or electrical components like water pump. For
example, If the water level goes low in the water tank, The
low level sensor give the signal to the PLC,then the PLC On
Commamnd singnal goes to Electrical panel to start the
water pump. It is called give and take command
DCS is device which is used to operate the mechanical or
electrical components through your PC. From the PLC HMI
Display controller, take the all command to DCS which is
programmed in your PC. So It is easy to identify or check
mechanical or electrical components running condition and
also it can be run the motor through DCS which you are
sitting in PC.
Is This Answer Correct ? | 3 Yes | 3 No |
What happen if we install flow meter with orifice plate, but bevel position is in upstream and not in downstream
How three wire proximity can be used in place of two wire proximity?
is there anybody who knows how to create a palindrome program without using string functions just conditional statements? thnx for helping
how the calculation of faut current level
what is impeller front clearance of pump ?
if salary paid per month rs. 16000/- of female <65 i will deduct tds from his salary please what i will do explain?
what is a benifit to configure site to site vpn ?
What you know about ISO 9001? What is quality management system? Weather QMS is suitable,adequate and effective or not? Is there any Quality Policy? Is there any Quality Objectieve? If yes, then what are they. How they are planning to achieve Quality objectives? Weather they are measuring quality objectives?
reversing of each word in the string
any body tell me why 4-20 ma use as a current any reason for this amount why not 3-25 ma?
give comparison of three wire & two wire sensors.
What is centre height in cnc lathe
0 Answers ABTS, Maruti Suzuki,