how speed of the conveyor can be calculated
Answer / naseeb ahmeds
for that u have to first know the material which is being
conveyed by the conveyor.
Basic thing is Lump size of material:-- mm
then
1). find out the lump size factor of material
for that refer(IS 11592)
2). then find the Abrassiveness factor of the material
for that refer(IS 11592)
Add both the factor and fin out the belt conveyor speed from
IS table.this is simplest Method.otherwise it is lot of
difficult to find the speed in general.
| Is This Answer Correct ? | 12 Yes | 2 No |
Based on the recruitment program and the expected resumption date, can you relocate to Canada if employed by 10th of July 2012?
1 Answers Cree Construction Development, Petromar,
Give the function of evaporator?
What is the differance between Quality Assurance Plan & Inspection Test Plan
Types of pressure
2 Answers ABC Inc, RRB, Siemens,
Tell the octane number in India???
What will happen when engine stays in critical speed of 58-65 RPM?
An employ has after increment has Gross Salary 22000 rupees per month. Earlier he was covered in ESI . now should we deduct ESI from his salary or not.
what is the refrigerent
materil used in bearings
4 Answers National Engineering Industries,
please send me model question papers for DVC Examination diploma mechanical
What instrument in a car measures its speed?
Why efficiency of gas turbines is lower compared to i.c. Engines ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)