Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to find out capacitor range?

Answers were Sorted based on User's Feedback



how to find out capacitor range?..

Answer / pratheesh

About which capacitor are you talking about.
If it is the value of the capacitor in Capacitor bank in
substations, first of the we have to calculate the reacive
power(Inductive reactive) of the system.
The main purpose of adding the capacitor in the electrical
network is to mininize the inductive reactive power by
adding capacitance.
If u could find out the inductive reacive load of the
system, we can calculate the capacitor value to neutralize
the same amount of inductive reactive power.

Is This Answer Correct ?    6 Yes 1 No

how to find out capacitor range?..

Answer / sheik

to measuring the load value

Is This Answer Correct ?    3 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

time constant of RC series circuit?

2 Answers   DVC,


How to put breaker in service / test position.

1 Answers   KSEB, L&T, Siemens,


why is  use the star and delta connection and difference

1 Answers  


operating Lt & HT voltages used in India?

8 Answers   Essar,


pls,send the previous year written test questions.

0 Answers  


what happens if DG N earthing fails while running and N Earthing fails while Transformer on load ???what will be the impact ???????/

2 Answers  


at what base you will tell the direction of rotation of dc motors and generators?

0 Answers  


Explain Analog and Digital signals?

1 Answers   UOG,


rating of ups??

1 Answers  


When we are working on transformer(132\11KV). we are going to isolate the transformer from both HV side and LV side. then we are applying grounding on both side. My question is that we required to isolate the VT which is still connected from secondary side.?

1 Answers  


(1)Can earth and be conected together (2) what is the diferent between earth & neutral

0 Answers   VACC,


auto reclosing scheme for radial ehv feeder is to be implemented or not?

1 Answers   State Board,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)