why moment is create in fixed beam. And why moment is not
create in simply support beam
Answers were Sorted based on User's Feedback
Answer / ka
in a fixed beam the fixed ends are restrained from rotation
as a result of which a reacting moment is created but in
simply supported beams the supports are free to rotatein
the plane of action of load so there does not exist any
reacting moment
| Is This Answer Correct ? | 43 Yes | 4 No |
Answer / dunstan
fixed end are restrained for all degree of freedom
therefore create moment, but simply supported end(pin
joint)is free for rotation. therfore no moment.
| Is This Answer Correct ? | 22 Yes | 2 No |
Answer / ppl
Positive moment (with tension in the bottom) is created in
both simply supported and fixed beams which are loaded by
gravity. However, this moment is less in fixed beams, since
a fixed support is made to resist some of the moment in the
beam. As the other answers partially said, negative
moment(with tension in the top) is only created in fixed
beams because of the moment resistance in the connections.
True simply supported beams do not have negative moment
because by definition, their connections do not resist moment.
| Is This Answer Correct ? | 10 Yes | 1 No |
in case of fixed baem, both ends of beam are fixed & in order to make unit slopes in the end ,moment is acted..but in case of simply supported beams as ends are free ,therefore no moment is acted.
| Is This Answer Correct ? | 1 Yes | 11 No |
What is full form of r.c.c?
What is the difference between Grade I, II and III of GSB?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
In which direction is bottom bar of rectangular footing is placed in short or long.
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
what is the maximum number of course that can be laid according to IS code and the max height.
in the earthquqke the profile of water on dam is parabolic or not
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
how to calculate total cost for slab 35'×8'
Difference between P.C.C and R.C.C?
24 Answers Amit Enterprises, D Link, SAT, Surya Constructions,
how to calculate sand in CFT from a concrete foundation (m^3)???
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)