Answer / sandeep patel

first prepare I/O list, then do cabling from and to I/O modules. after cabling do Ioop checking and do programming as per requirement of process sequentional operation and then..then take trails...

Is This Answer Correct ?    0 Yes 0 No

How is plc installing done..

Answer / aashish

Step:
1.Define objective e.g. if temperature of heater goes
beyond 200 degree celcius the fan made on untill
temperature reaches 150degree celcious.
2. then the given objective is converted in programm by
using set of instruction it may be Plc programming language
s5 or s7 in Ladder logic or STL
3. install program into plc using required input from
module.
4.then start plc it works as per instruction.
5.Requred to connect plc output to field contactar,
6.connect sensor feedback to plc system.

Is This Answer Correct ?    1 Yes 2 No

How is plc installing done..

Answer / raviunique2@gmail.com

plc installing is done through via codings it means plc is
nothing but the device and combination of software and
hardware codings means the normal c program is installed in
hardware according to their requirements ..........

Is This Answer Correct ?    1 Yes 15 No

Post New Answer

More Instrumentation Interview Questions

why we use double acting valve and where?

1 Answers   Aker Solutions,


how we convert Mili ampere to temp txt,level txt,flow txt,pressure txt range value

4 Answers   Saadi Cement,


how to make a calliberation for deffirential pressure

3 Answers  


What are the maximum packet size of: a) HART b) Profibus DP c)Profibus PA d) DeviceNet e) Foundation Fieldbus

0 Answers   EIT,


i have one temperature TX in my loop check time once i was remove elament temp gose maximum then i am conect corectly but still now temp showing maximum what can i do this problem?

2 Answers  






i am having information technology branh ....... can i prepare for psu exam

0 Answers  


What is BMS (Building Managment System)& is AHU / HVAC are in BMS.

12 Answers   Alghanim,


What is fault tolerent system

2 Answers   GNFC,


NAME ANY TWO ELASTIC PRESURE SENSOR?

2 Answers   DVC,


Reason for capillary type dp level transmitter fluctuation

0 Answers   BMB, Enppi,


What is mean by SMART in an Instrumentation. is any full form for SMART?

3 Answers  


How can SmartPlant Instrumentation users take advantage of these global services?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)