Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how do measure the safe bearing capacity of soil?
what is the compresive strength for concret?(max.&min.)



how do measure the safe bearing capacity of soil? what is the compresive strength for concret?(max...

Answer / sobhanbabu

we are having 3 tests to know the bearing capacity of soil
1.plate load test
2.standard penetration test
3.cone penetration test
compressive strength nothing but the maximum load it can carry

Is This Answer Correct ?    10 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

why secondry beam rest on primary beam

1 Answers   Exotica Housing Infrastructure,


Which IS Code describe the industrial flooring?

4 Answers   L&T,


procedure for preliminary selection of size of column of 5 storey building

0 Answers  


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

0 Answers   Progressive,


Formula of area of crane hook

0 Answers  


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

0 Answers  


why we providing 40mm cover to columns & 25mm to shear wall

1 Answers   NCC,


what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

1 Answers  


 Which Types Of Bricks ? 

0 Answers   Assotech,


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

0 Answers   Apex,


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

0 Answers  


How much standard bricks required for a wall of 9*1200*1200 inches

1 Answers   ABC, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)