Your favourite area of interest
Answers were Sorted based on User's Feedback
Answer / guest
Choice is yours - but answer the confident subject within
yourself - relevant to refinery
| Is This Answer Correct ? | 24 Yes | 13 No |
Answer / sam sidda
what is the chemical formula and iupac name of transformer
oil or mineral oil.
| Is This Answer Correct ? | 1 Yes | 4 No |
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.19 : In the purchase of a unit of engineering office, a loan has been made to a bank with the following details : Term N = 30 years; interest rate R = 8.07 % / year; security : primary residence; present value pv = $450000; salary = $75000 / year or $56000 / year after tax. (a) Let the discounted present value PV = [ 1 - 1 / (1 + r) ^ n ] / r for arrears, where r = interest rate of discount, n = number of payment, ^ = symbol for power. If the loan repayment was made monthly : (i) calculate the value of r where r = R / k and R is in decimal value; (ii) find the value of n where n = kN; (iii) estimate the value of k where k = number of repayment per year; (iv) calculate the value of PV based on the formula of discounted present value. (b) Calculate the monthly repayment of the loan, MR based on the following formula : pv = PV x MR. (c) Find the percentage of salary remains after paying the loan every month.
how can i prepare for gate chemical in kolkata
What is % of piping & equipment cost for a chemical plant having batch process?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.9 : In the modelling of the total of n rolls of a dice by an engineering student, let D be the random outcome of rolling a dice once. (a) Find the probability of outcome of D = 1, 2, 3, 4, 5 and 6. (b) Find the average score of each rolling of a dice D. (c) Find the expected value, Sn of n rolls of a dice in term of n and D. A new dice has a value of D* = D - 3.5. (d) Find the values of D* for each volume of D = 1, 2, 3, 4, 5 and 6. (e) Find the equivalent model of Sn in term of n and D. (f) Find the expected value of D*.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.16 : An engineer would like to invest his money in a home, business and bond. The implicit interest payment frequency is monthly for home loans, quarterly for business loans; semi annually for bonds. A generalized mathematical formula to calculate I = interest rate equivalence is I = (1 + i / N) ^ N - 1 where i = annual interest rate, N = number of payment per year. (a) Calculate the value of N for : (i) home loans; (ii) business loans; (iii) bonds. (b) For i = 0.08, find the value of I for : (i) home loans; (ii) business loans; (iii) bonds.
If the refrigerator is left open in closed room, What will be the effect on room temp.?
Explain how can you determine the proper pipe thickness for a slurry line?
Explain what are the affinity laws associated with dynamics pumps?
QUANTUM CHEMISTRY AND CHEMICAL ENGINEERING - EXAMPLE 31.9 : When an algebraic product is defined on the space, the Lie bracket is the commutator [x,y] = xy - yx according to Lie algebra in mathematics. If [p,x] f(x) = px f(x) - xp f(x), p = -ih d / dx, find the value of [p,x] in term of i and h.
Which book I should refer for designing heat exchangers and reactors?
how FOULING effectd the heat transfer rate
why 14.7 pound/inch2 is used in idustries as unit of pressure bcz here not sea level and not a temperature is 0C (zero degree celcius)?????????
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)