Anyone have sample questions for bhel please send me since
Iam appearing for this exam.
Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
Answers were Sorted based on User's Feedback
Answer / renu
Anyone have sample questions for bhel please send me since
Iam appearing for this exam.
Kindly send this to my e-mail: nethaj_babu@yahoo.co.in
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ratnakar maurya
hi renu i also want this paper,
if you will get it then pls send it to
ratnakar_maurya@rediffmail.com,ratnakar.maurya@gmil.com.
thanks
RATNAKAR MAURYA
L&T LTD.
9772218175
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / reena
hi renu i also want this paper,
if you will get it then pls send it to
mrsjayarajan@gmail.com
Is This Answer Correct ? | 0 Yes | 0 No |
what would be the design load of R.C.C Cooling tower per cell.?
calculate for 1 m3 cement, sand, coarse agree gate ,kg?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
How to calculate the volume of sloped isolated footing?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
19 Answers DNA Infrastructure, HCC, L&T,
What are the types of ladders?
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge
name three materials used in drainage work
In interview,if they ask what are your achievements in your career?how to answer this question?
2 Answers GMR, Taehwa Enterprises,
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why?