what is system testing?
Answers were Sorted based on User's Feedback
Answer / winrunner
Testing of the whole system to verify that it meets requirements
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / sunithayagnamurthy,heartcom in
After Functionality testing we will do this testing...
system testing.It is like blockbox testing.....to test the
functionality is working or not according requirment ....
this is system testing
If any mistakes is thr please excuse
Thanq
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sunil reddy
Testing an integrated system is called system testing
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / ashok3_hyd@yahoo.com
system testing:
system testing define as test the application at once after
comption of unit,integration,blackox testing any bugs are
occuring or not
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / sunitha
after integration testing has been finished we will do this
system testing by testing for whole system
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / happy
The whole application will be tested in system testing and
testing will be in client environment(If client is usuing
win xp,ie5 combination test environment should follow the
same)
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / rafi
In system testing we test the test environment must similar
to the production environment.It means software
configarition,hardwareconfigaration and operating system
and it versions should same at the both ends.
In system testing we r not warried about FT and IT.
| Is This Answer Correct ? | 0 Yes | 1 No |
1.tell me one bug what u find ur testing and how u ill fix severity and priority? 2.difference between web and window based testing? 3.bug life cycle?
Tell me the advantage and disadvantage of cookies?
I need a brief decsrpition on How to test borwser compatabilty and O.S compatibity? Wat are the techniques to test? TIA
Which is the best testing model?
what is test model in testing?
in SDLC,at what phase life cycle stops?and what are the input and output of each phase?
How can one file compare future dated output files from a program which has change, against the baseline run which used current date for input. The client does not want to mask dates on the output files to allow compares.
If developers team doesn't agree with the bug raised by you, what is the next step would you take
what is the difference between bug log and defect report?
whatis testing?
What is a Bug Report?