When test plan will be prepared in v-model?
Answers were Sorted based on User's Feedback
Answer / vedha_sathya
test plan prepares in each and every phage in In vlidation
phase that is right hand side
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / saff
hi all plz correct meif i am wrong
a/c to my knowledge just acquired
test plan is written in the beginning itself that is after
we get requirmetns
this will be a documented and as we get the new info from
development we will be updating the info in the test plan
why because if we dont do test plan first ,how can we tell
how much time it will take for testing what ever phase we r
testing
Is This Answer Correct ? | 1 Yes | 0 No |
The test plan will be prepared in various stages in a V
Model.
The UAT Test plan will be prepared at the requirement
analysis phase as one of our friend has said and the System
test plan will be prepared during the High Level Design
Phase. The integration test plan during the Low Level
Design phase.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / vishnu
a rough test plan at requirements phase
testplan at hld phase
according to that every activity will be done.
like templates used inside
inscope and outscope
milestones
terminology
risks and mitigation plans
and so on.
so plan is there from the beginning.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / g
1> System test plan in requirement analysis phase;
2> Integration test plan in High level Design phase;
3> Module test plan in Low Level Design phase;
Is This Answer Correct ? | 1 Yes | 2 No |
3) What is PDCA Cycle?
4 Answers Mind Tree, Scope International,
8. What are the last three Web accessibility topics or questions you researched on the Internet?
Penetration testing
when do you escalte issue to your manager?
What is Bicycle Testing?
Difference between Stakeholder and Relevant Stakeholder?
What is Test Case?
difference between manual testing and automation testing
what is test plan and test stategy and also differnce bet them?
WHAT IS THE DIFFERENCE BETWEEN A FUNCTION & ACTIONS IN QTP? WHAT IS THE DIFFERENCE BETWEEN A FUNCTION & PROCEDURE IN QTP? DIFF BETWEEN ACTION AND REUSABLE ACTION?
This is scenario based question atht I faced in an interview-"There are 2 systems with SIMILAR H/W and S/W configurations. I opened my gmail account from 1st system and I could open my gmail account successfully & able to operate it without any problem. But when i try to open my SAME gmail account from 2nd PC, I can't access it at all. So what could be possible defect/problem?" (Note that the email ID and password used is valid and correct)
In which phase the GUI Testing will be held on V model?