Imagine you are in an empty room with a fan, a bulb and an air conditioning system. There is a switch board on the wall with 32 switches and 2 plug points. You are tasked with testing this setup. Assume you are not given any requirements whatsoever. How would you approach it? What would be your priorities? If you make any assumptions, do state them.
508 compliance
Test Track Pro. Defect report formate? what r the attibutes?
can anyone please tell how a rally tool is used in testing. what are the tester roles in using this tool and the detail working of this tool.
Difference between verification and validation?
How do you handle conflict with programmers?
what are the testing methodologies?
WHAT IS ROLE OF TESTER IN TEST PLANNING?
Can anyone give me an example for positive and negative scenario??
Tell me example for Risk,Mitigation,Assumption?
diff b/w project based testing and product based testing?
What is the meaning of incident in testing?
what is traceability matrix?is it mapping b/w the user requirements and prepared test cases?but i want a detailed explanation?