why you considers yourself suitable for the post of site
engineer
Answers were Sorted based on User's Feedback
Answer / mamatha
Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.
| Is This Answer Correct ? | 19 Yes | 5 No |
Answer / sumeet
as i think that i am capable of doing this kind of work as i
did many work visit and liked to do work in the field. also
im good at management so i wold love to handle the situation.
| Is This Answer Correct ? | 9 Yes | 7 No |
Answer / shahzad
actually so far as i think that i'm capable of doing such kind of work b,coz previously i'hv workd some where and entirely awared with the terminology of site work.thats why i like to work on site and feel suitable for this position
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nitesh
i think m suitable to work as a site engineer because i m too curious to manage the things around me and the tasks allotted in the most efficient manner.i think that i can suitablt adjust myself in the workng environment of the organisation and too in an effefective manner for the growth company..
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / satish nirmal
site engineer is a monitor of all team member who will work under him and think i can handle very efficiently, as have a passion also to execute the construction work very properly. i like to play a vital role for doing coordination with consultant and architect.
| Is This Answer Correct ? | 0 Yes | 0 No |
how to find the percentage for minimum reinforcements as per IS:456 for beam , column, slabs.??
. What three Specific Job Positions do you target from the Company
definition of compressive strength. definition of compressive stress.
what is assumption consumption of steel per m3 for raft
what is pqc
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
In interview,if they ask what are your achievements in your career?how to answer this question?
2 Answers GMR, Taehwa Enterprises,
what is the 0 value in quantity surveying
from where ican get sample papers for CET-delhi 2012
what is workability,define it?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)