How cracks in concrete can be avoided?
No Answer is Posted For this Question
Be the First to Post Answer
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
fluid flow takes place due to its:- viscosity,comprssibility,surface tension,deformation undershear force
what is the detention period for oxidation ponds
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
How to findout safe bearing capacity after stabilization of soil by method of the confinde method.
please i wont to know the full meaning of P V C
How to find weight of 1cu.m concrete in varies grades? and giive calculation.
May I Get an E-mail ID or contact details of Mr. C.M.Dordi Vice President - Technical Sales Ambuja Cements Limited. Please
Critical Path Method is...
how to remove the quantity of metal 1 and metal 2 in concrete
Describe the sections included in a typical bill of quantities