Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx



Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so ca..

Answer / remesh babu pillai .k .p

cost Rs .3000

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

How to do bbs in excel format

0 Answers  


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

0 Answers   Anish Constructions, STUP Consultants Pvt Ltd,


In which grade of steel the laping length required is more,Fe 415 or Fe 500 ? and why?

1 Answers  


Brick is fire resistant than stone because––

1 Answers  


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

0 Answers  






undistributed samples are obtained by

0 Answers  


what is the use of beam end forces while using a staad ? wha they are show

0 Answers  


which chemical is used for corroded steel

3 Answers  


Can we use PPC cement for RCC works? Upto which grade it can be used?

3 Answers  


Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

0 Answers  


What is m20 and What is  20 ? 

2 Answers   Sukhwani Constructions,


why loss of strength in concrete in 7 days cube test i am not geting mim 7 days strength that is 67 percent for M-35 and my mix design is perfect there is no doughty,and my results are near to 7days percentage but not 67 percent.

4 Answers   UPPSC Uttar Pradesh Public Service Commission,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)