What is the result of cube in 7 days test ?
Answers were Sorted based on User's Feedback
Answer / prasad sathe
It must achieve 67% in 7 days test of crushing.
| Is This Answer Correct ? | 14 Yes | 2 No |
in 7 days 65% of the characteristics compressive strength will be achieved. the test will be important because, as per standards the form work will be removed after 7 days of curing.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the weight of concrete for 1 cum?
How many cement & sand require in 300 sq ft plaster 8mm thickness
1 Answers Kirthi Construction,
What is the soil bearing capacity ? And how it should be to built a multistory building ?
3 Answers Clancy Networks, eConstruct, UltraTech,
What are the ingredients of pre-stressed concrete?
how much lap we should provide in columns for Fe-500?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Is there any alternate for plastering
Why we use sin wave only in ac not use any other form of wave?
Is the ratio fixed for M-20,M-25,M-30,M-35....grades of concrete??
2 Answers Ahluwalia Contracts, L&T,
why cracks develop at the upper corners of doors openings
i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula
What is the Oneday Productivity for 1 Skilled Carpenter and 1 Steel fixer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)