What's is mean by survey
how much steel required for 1 square meter slab?
Explain your project management?
2 Answers HNB Engineers, Shell,
what is the mode of method of face bar measurement
how much L is provide in footings. what is min and max length of L. what is the formula
In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)
Explain what is change order request?
What was your synopsis for thesis topic?
The foundations are placed below ground level, to increase?
What are the types of Road in India?
what is the FE415 & FE500?WHAT IS ITS STRENGTH?
What is the difference between M20 and M25 concrete?
what is the weight of wet concrete?