Meaning of civil engg. in hindi

Answers were Sorted based on User's Feedback



Meaning of civil engg. in hindi..

Answer / vikrant

Janpad abiyanta

Is This Answer Correct ?    8 Yes 2 No

Meaning of civil engg. in hindi..

Answer / singhashwinee@gmail.com

Ashainik Abhiyanta

Is This Answer Correct ?    2 Yes 0 No

Meaning of civil engg. in hindi..

Answer / karan

Janpadiy abhiyantriki

Is This Answer Correct ?    0 Yes 0 No

Meaning of civil engg. in hindi..

Answer / ashok kumar chaudhary

Janpadeey abhiyantran

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how much steel required for 1 sq.m area?

12 Answers   L&T,


Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

0 Answers  


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

0 Answers   Tirupati Exim,


IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

0 Answers  


What is specific gravity???

0 Answers  






the beam size (450x1000) effective length is 19.0mts no intermediate supports and top 8nos 32dia and bot 32dia and condition is stragge lap. it is exceeding lap zones and exceed length of bars?

1 Answers  


What do you understand by “preset” during the installation process of bridge bearings?

0 Answers  


what is difference between bending and twisting

4 Answers   Sam India,


density of flyash

4 Answers  


a)If column dimensions are 250*400mm , what will be cutting length for 8mm stirrups and how to calculate it? b) If beam dimensions are 200*400mm , beam coveris 25mm , slab cover is 20mm , what will be the cutting length for stirrups? c)Column dimensions are 250*400mm , reinf. is 12nos. bar of 16mm dia , stirrups provided are two legged, what will be the length of each ring? Regards

27 Answers   Alfaraa, Speco, Supertech, Welspun,


Middle point of any slab is raised 10-12 mm during shuttering work because––

4 Answers  


limit value of bulking of sand

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)