An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows.
a) 200 medium size businesses; each needs 16 addresses
b) 400 small businesses; each needs 8 addresses
c) 2000 households; each needs 4 addresses
Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
No Answer is Posted For this Question
Be the First to Post Answer
HOW TO MEASURE AC VOLTAGE BY USING GALVANOMETER?
what is PDU in transformer?? which company manufacture??
what is the acceptable earth resistance value ?
In LT cables 3.5 core cable are available that means 3 core and .5 for neutral Why .5 for neutral and is there any reason for that please suggest thanks and regards pavan kumar
how to set time from star to delta starter
3Cx240 & 3Cx300 sqmm Al. cable from lv side. What is the calculation for this cable??
what is mean by hormonics & surge? and it's effects?
In 3phase power= Root*3*v*i*cos@ What is the power in 2phase....??? and Derive it
whether inrush current for lamps or capcitors should be considered cable sizing to feed that load.
A 6.6 KV motor breaker is try to Drack OUT by me while the motor running. What will Happened? a, will Trip. b,Drack Out lever will not access c, will get shock d, noting will happened
How can step up and step down process in power transformer
1 Answers MSETCL Maharashtra State Electricity Transmission Co Ltd,
If we have 11 kv RYB Phase single core cable near about. Then wht effect and losses