How many percent of power are not being registered if we bypass one side of the meter base terminal using #8 cu wire on 1-phase kwhr meter.
50 % if the same wire is used for the current coil of the meter
Is This Answer Correct ? | 1 Yes | 0 No |
If connected load of Asphalt plant is 375Kw. What suitable KVA DG set is required. What is calculation formula. what extra load have to consider. in what efficiency it will work.
How to convert resistance value at 20 degree to 90 degree?
Explain what is rated speed?
what is the difference between ground, earth and neutral?????????....
we have provided 30 mA rccb to water cooler.but we feel shock in cooler body.what is the reason?
THE 40 MW OF POWER FOR 220 V III PHASE POWER CONNECTION REQUIRES HOW MANY KVA POWEER REQUIREMENTS
7 Answers Chartered Accountant,
how many maximum nos of add on contact we shd provide on 4 no contactor
gas turbine genrator reactances
upto how much low RPM we will run the commercial motor which is run through VFD without any problem occurs in motor.Motor rating Duty is S1 & RPM is 1400.
What is clock position of Transformer?what are the clock positions are there?and what is different of them?
What is your favorite aspect of the engineering field?
In view of Electrical Engg. What is the use of SCR(Silicon control rectifier)