what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / madhusudhan

M 7.5

Is This Answer Correct ?    22 Yes 3 No

what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / ash

m 7.5

Is This Answer Correct ?    12 Yes 1 No

what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / divusp

M20: 1:1.5:3
M15: 1:2:4
M10: 1:3:6
M7.5:1:4:8
M5: 1:6:8
above M20 must go for design mix

Is This Answer Correct ?    5 Yes 0 No

what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / vijay kumar nishad

m5

Is This Answer Correct ?    2 Yes 1 No

what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / raju

M7.5

Is This Answer Correct ?    1 Yes 0 No

what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / ashish shah-surendranagar

M10

Is This Answer Correct ?    0 Yes 5 No

what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / sumit patel

m10

Is This Answer Correct ?    0 Yes 5 No

what will be the grade of concrete for PCC having ratio 1:4:8?..

Answer / k.prakash

this Answer is M5

Is This Answer Correct ?    0 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

what is daily progress of a steel fixer average how many kilograms he can fix in 8 hours average

1 Answers   Al Latifia Trading Contracting,


what is the procedure to clean the mivan technically?

1 Answers  


how many reputations of ply wood for concrete works can be used?

3 Answers  


What is the difference between Fe 500, Fe 500 D and Fe 515.

0 Answers   Pioneer,


What are the causes of building collapse?

0 Answers  






Why we are using 150 mm X 150 mm X 150 mm cubes for testing the compressive strength of concrete in CTM and why not other sizes?

1 Answers   BARC,


what will be the lap length of column reinforcement in case of welded lap

2 Answers  


explain five benefits of using standard terminology in the measurement process?

0 Answers  


What quantity of 1.0 m3 bricks required?

0 Answers  


Permissible wastage of cement as per IS code ? In which IS code I get it?

0 Answers  


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

0 Answers  


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

0 Answers   Student,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)