HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE
STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
No Answer is Posted For this Question
Be the First to Post Answer
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
How to find out slope footing concrete
0 Answers Ekta World, Punj Lloyd Ltd,
what is pile foundation?
Explain what is the difference between built area and super built up area?
how to calculate mivan shuttering matrial
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
width rangs in NH,SH in one-way lane &two-way lane why we are provid caber is there any reson for that
What is difference between limit state and working stress method? How it is applies in building structure.
How to determine spacing of bars in slabs or beams
Why the finite element method is lower bound solution?
what is lap length?
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?