Answer / mohammed shahid
Well, there are many factors the completion duration depends
on and a duration for the project of G+22 cannot be derived
and said to be so-and-so months, as not everything stays
ideal and as planned.
1. For Excavation - Area of the building and the depth and
also the type of earth we're excavating. (Hard rock takes a
longer duration than the soil)
2. Sub-structure - As you've mentioned it is a G+22, i'm
assuming there is no basement but usually a G+22 has
2basements. Hence as per your question and details provided
we're omitting the basements but still the area of the
building plays a major role and also the structural (RCC)
vertical members and the types of foundations. If it is a
raft foundation, it takes lesser time with say A number of
manpower and if its isolated footings with a few combined
footings with the same A number of manpower then the
duration might triple.
3.Superstructure - Depends on the area, the vertical
members, the depth of the beams, structural projections,
number of lift shafts and staircases. One suggestion here is
the "SLAB CYCLE" can be derived and the same an be
multiplied by 22 for the entire structural (RCC) work of the
building.
4.Finishing - The same concept of "SLAB CYCLE" can be
derived and multiplied by 22 for the finishing duration of
the building.
5.Handover - This shall include attending to the snagging
list of activities and rectification works if any. the same
can be considered as approximately 60days.
Still if the Interviewer demands for a duration at the end
of the above explanation (presuming he will not), you can
give him an approximate figure of 24months maximum.
Is This Answer Correct ? | 5 Yes | 0 No |
Define block?
how calculate cutting length of stell in slab and column? give brif discussion with formula?
3 Answers ATS, Gammon, Pegasus,
How you can turn off the display for dimension in CAD?
what is the significance of bending moment in a structure?
Why ss Steel is not using in RCC concrete.
What is grouting? Why it is done?
material used for mendrel use to bend epoxy coated rebar
0 Answers Saudi Aramco Shell Refinery Company SASREF,
what will be the quantity of matterial and water for pcc in 1 cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Which word is coolest among the 26 alphabets?
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
Ratio of cement : sand for fixing slab and tiles in the floor and also quantity of cement and sand requires for laying slab and tiles separately (area 100 sq. ft)