how much cement and sand is used for plastering 1646 sq
feet,for 12mm thickness and ratio 1:4

Answers were Sorted based on User's Feedback



how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4..

Answer / abdul samad

for 12mm plastering, first convert 1646 sq.ft into sq.mt ie
= 1646/10.76 sq.m, = 152.97 or say 153 sq.m!!

now convert that into cu.m by multiplying with thickness of
plastering i.e =153*12/1000, = 1.836 cu.m!!

wet mixed mortar for uniform layer = 1.836 cum, adding 30%
for filling up joints, uneven surfaces.. =
1.836+1.836*(0.25) =2.295 increasing again by 25% the dry
volume = 2.295*1.25 = 2.869 cum, the mix proportion for
plastering is 1:4 i.e cement =1/5*2.869 =.574 cum,
=.574*1440(density of cement) = 826 kgs, similarly sand =
4/5*2.869 =2.296 cum,
= 2.296*1840(density of river sand)= 4224.6 kg's

Thank you, all the best!

Is This Answer Correct ?    16 Yes 0 No

how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4..

Answer / vinod

Cement = 16.82 (=say 17 bags)

Sand = 2.348 Cu.m

Is This Answer Correct ?    9 Yes 5 No

how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4..

Answer / sjtbehera

let it be convected in to sqm i.e. 1646/10.8= 152.40sqm

per 100 sqm - cement -12 bags and sand 1.62 cum required

please calculate according to that

Is This Answer Correct ?    4 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

Rate of plasting per sq.ft...?

4 Answers  


Please let me know the simplest way of Calculating mix designs for any grade.

1 Answers   Bureau Veritas,


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

0 Answers  


What is the difference between absorption & adsorption and sorption?

0 Answers  


FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38

1 Answers  






one cricket ball through in chennai and jaipur same speed where bowl has fast speed

1 Answers  


the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this

4 Answers  


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

0 Answers  


what is steel consumption for high rise building column, beam, slab,footing

5 Answers  


what grade of concrete to be used for lintel when reinforced with bamboo in place of steel?????????

2 Answers  


per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations

0 Answers  


what is difference in chemical composition between fe415 and fe500

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)