how to calculate rate analysis for column shuttering
Answers were Sorted based on User's Feedback
Answer / rustam jamal
Assume Column Size- 1.200x0.300 and Height = 3.000
than Qty for Conc. = =1.2x0.30x3.0= 1.080Cum
Shuttering Area = 2x1.2x3.0=7.20
= 2x0.30x3.0=1.8
Total =9.0Sqm
In 9.0sqm Shutterin 1.08 Cum Conc. req.
so For 1 Cum Shuttering Qty = 8.333
In case of Columns we required 8.33 sqm of shuttering area
in 1 Cum of Concrete
Is This Answer Correct ? | 88 Yes | 31 No |
Answer / ajinkya patil
for 1.2x0.3 c/s and 3 m height
total shuttering area = ((1.2*2)+(0.3*2))*3= 9 sq.m
calculate total plywood or shutters required
a)cost of ply or shutter panels.
b)cost of supporting material required.
c)labour cost of shuttering.
d)labour cost of deshuttering.
e)jointing materials like nails & tie bars & other miscellaneous material
cost per sq.m= (a+b+c+d+e)/total shuttering area
Is This Answer Correct ? | 26 Yes | 7 No |
calculate for 1 m3 cement, sand, coarse agree gate ,kg?
how new RCC roof joined with existing RCc roof
what is rebaring?
What is the worlds largest concrete dam?
how to calculate the weight of concrete
concrete coverings outside steel
13 Answers Jain Housing, L&T, Supertech,
standared weighs for differnt grade of concrete
What is the difference between undo & redo?
rate analysis hiring of generator 62.5 KVA
How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab thickness or slab should be calculate in to in ?
why we take cube depth 150mm for testing
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??