Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate rate analysis for column shuttering

Answers were Sorted based on User's Feedback



how to calculate rate analysis for column shuttering..

Answer / rustam jamal

Assume Column Size- 1.200x0.300 and Height = 3.000

than Qty for Conc. = =1.2x0.30x3.0= 1.080Cum

Shuttering Area = 2x1.2x3.0=7.20
= 2x0.30x3.0=1.8
Total =9.0Sqm

In 9.0sqm Shutterin 1.08 Cum Conc. req.

so For 1 Cum Shuttering Qty = 8.333

In case of Columns we required 8.33 sqm of shuttering area
in 1 Cum of Concrete

Is This Answer Correct ?    88 Yes 31 No

how to calculate rate analysis for column shuttering..

Answer / ajinkya patil

for 1.2x0.3 c/s and 3 m height

total shuttering area = ((1.2*2)+(0.3*2))*3= 9 sq.m

calculate total plywood or shutters required
a)cost of ply or shutter panels.
b)cost of supporting material required.
c)labour cost of shuttering.
d)labour cost of deshuttering.
e)jointing materials like nails & tie bars & other miscellaneous material


cost per sq.m= (a+b+c+d+e)/total shuttering area

Is This Answer Correct ?    26 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

cinder filling or Brick Aggregate filling in sunken portion.which one is better

1 Answers   Chenab Valley Power Projects,


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

0 Answers   L&T,


what are the values of compressieve strenght?

0 Answers  


What are the basic use of runners and standards of pipelines?

0 Answers   Bechtel,


yasser arfatcompleted his degree in civil from which university

0 Answers  


types of piles detail,

0 Answers   DLF, IVRCL, JP Group,


11. What was the reason for you to quit your previous job?

5 Answers  


what"s the formula to find the cement,sand,aggreegate(45mm) requirement for PCC?

5 Answers   L&T, Radiant Fire,


how much cement consumption in 1 sqmt of wall cleading work (dedo)?

4 Answers  


briefly describe your ideal job?

1 Answers   Bahwan Engineering,


How many bag of cement used in all type of RCC

3 Answers  


what is idealized curve for concrere and steel

0 Answers   CSIL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)