concrete cube strength if fail 1 no in 7 days .What is the
solution
Answers were Sorted based on User's Feedback
Answer / bharath
need to go for 3, 7 & 28 days. And care to be taken in WC
ratio & Cube filling process while concrete process
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / shashank
wait till 28 days result will come some time 7 days result
will fail due to poor workmanship will pouring the cube
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / riaz
The actual result come after 28 days but it still depend on weather condition
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ratheesh
If 7th day cube fail, we have to wait 28 day cube result.
Should be use skilled labours...then wont get any cube failure.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / mohd. haider
By checking the strength of member by core cutting or remote hammer test. If strength is OK. Than no problem otherwise take action seriously.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / amar kantak
RECHECK THE STRENGTH AND WATER , CEMENT , COARSE & FINE GRAVEL
QUALITY.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / pk priyadarshi
in three numbers cube one number cube discard and take two numbers cubs average strength if strength is found as per required that is ok
Is This Answer Correct ? | 0 Yes | 0 No |
what is Quality Reporting?
whether earth to the height of 80cm could be filled in the basement inm place of jamuna sand
what is the formula to find the diagonal shape stirrups?
Specific gravity of Cement? Water?
how calucate cement sand ratio for plstering
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
there is a residential building L = 20' B = 30' H = 20' stairs L = 3' H = 20' calculate the numbers of Threads and risers from stairs with formula
Why I-section is preferred to channel section?
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
List out the potential risk factors for workers on the construction site?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal