Answer / vijendrasinh
1 cum ratio 1:6
brick - 445 nos + 5 percent add.=500 nos App.
mortar 1 cum .30
cement= (1/7)*0.3=0.0428/.035=1.224 bags
sand= (6/7)*.30=0.26 cum.
Is This Answer Correct ? | 15 Yes | 2 No |
if brick size 240mm*115mm*71mm
so =0.00195cum
for full wall 25%(0.25)of mortar required
for half wall 30%(0.3)
if full wall means
req bricks=1-(1*0.25)=0.75cum
so=0.75/0.00195=384.6 no of bricks
req cement=0.25/(1+6)=0.0357cum
so=0.0357*1440=51kg
req sand=0.0357*6=0.214cum
note:prepare 15% extra mortar bcoz of voids presented in sand
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / neel
for one cum 1: 6 cement mortar brickwork
Bricks:- 500 no
Cement:- 15 bags
Sand :- 2.5 cum ( .9 brass)
Is This Answer Correct ? | 3 Yes | 11 No |
Should vertical shuttering done for CC/ RCC for Damp Proof Course (DPC) be measured?
1sqm tile laying how much cement required?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
what is the wight of 4"/6" solid block?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above
what is a louer? and for which purpose it will be used.
how the load will be transfer from pile foundation to soil?
how to convert m 25 concrete to m 40?
list out various type of codes:-
What is the difference between RCC & PCC?