Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the
Column drawing please answer give with example,thankyou,

Answers were Sorted based on User's Feedback



8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give..

Answer / sony kumar

8mm means dia. Of steel bar 2 legged means 1 stirrup & 4 legged means 2 stirrups 7" means 175mm center to center distance of stirrups

Is This Answer Correct ?    4 Yes 0 No

8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give..

Answer / nani

2L meens 2legged that meens one stirrup 4L meens 4legged that meens
2stirrus

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35

3 Answers  


after temping in cbr mould keep how many hours mould in water

2 Answers  


what is the minium content of cementous material per cu meter

2 Answers  


what is the difference between site engineer & site incharge

5 Answers   Infosys,


what is the concrete grade for 1034.13N/mmsq

2 Answers  


What is Definition Of Refuse Area In Building ? 

1 Answers   Arpee Group, Dudhwala Builders,


Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?

2 Answers  


Typical floor design load in Residential Building----------- -----

2 Answers  


Name the main components of a cad gui?

0 Answers  


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

0 Answers  


how much quantity required on weight of cement & on weight of sand for 1:4 ratio mortar?

0 Answers  


for a tachometer the additive & multiplying constant are 0 & 100 100 & 0 0 & 0 100 & 100

4 Answers   Ramky,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)