Dear sir/madam
I am in final year BE chemical engineering.Which companies i can apply .Please guide me.It is very helpful for me


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Chemical Engineering Interview Questions

In engineering economy, the future value of first year is FV = PV (1 i). For second year it is FV = PV (1 i) (1 i). For third year it is FV = PV (1 i) (1 i)(1 i) where FV = future value, PV = present value, i = interest rate per period, n = the number of compounding periods. By induction, what is the future value of $1000 for 5 years at the interest rate of 6%?

1 Answers  


PROCESS DESIGN - EXAMPLE 21.3 : According to a heuristic of chemical engineering plant design, assume a pressure difference dP = 4 psi for each 10-ft rise in elevation. A pump is needed to pump liquid from a storage tank at a lower elevation to a heating tank at a higher elevation with the elevation difference of 60 ft. (a) Find the pressure loss due to such elevation. (b) If the required minimum inlet pressure to the heating tank is 9 psi, with 1 control valve is installed between pump and heating tank, what is the dP minimum required for the control valve and the entrance to the heating tank when the heuristic mentions that at least 10 psi is required for the control valve? (c) The pressure at the inlet of the pump is 8 psi and the flowrate of the liquid produces pressure head of 50 psi. What is the total pressure produced by the pump? (d) Assume a pipeline dP of 2 psi / 100 ft for liquid flow in a pipe according to heuristic, what is the approximate maximum length of the pipe in ft that can be installed between the pump and the heating tank?

1 Answers  


What are the strategies acquired to cure tube vibration and exchangers in a shell?

0 Answers  


What are flameless oxidizers?

0 Answers  


GENETIC ENGINEERING - EXAMPLE 27.2 : (a) Three genes, I, J and K are available. All these genes are linked with respect to one another. If the percent recombination between I and J is 8 %, that between J and K is 10 %, and that between K and I is 18 %, what is the order of the gene? (b) Twenty six genes, a, b, c, d, e, f, ... x, y and z are available. All these genes are linked with respect to one another. If the percent recombination between a and b is 3 %, between b and c is 3 %, between c and d is 3 %, ... between w and x is 3 %, between x and y is 3 %, between y and z is 3 %, then what is the percentage recombination between b and y?

1 Answers  






NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.

2 Answers  


What is a barometric condenser?

0 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.8 : Cash flow agreement where the sign + or - of the amounts are start negative and at a point switch to positive and stay positive is referred to has an investment. The cash flow could be denoted by the symbol of [a, b, c ...]. Consider the following two cases in a biochemical factory : (a) You pay $1 today. You receive $1.05, one year from now. (b) You pay $3 today. You receive $5, one year from today. You pay $2, two years from today. Determine if cases (a) and (b) are an investment or a business transaction with cash flow symbol. Find the interest rate r in the cash flow in both cases (a) and (b).

1 Answers  


ENVIRONMENTAL ENGINEERING - QUESTION 22.3 : A well delivers 225 US-gallons per minute of water to a chemical plant during normal system operation. (a) Calculate its flowrate in the unit of mega US-gallon per day or MGD. (b) The following formula is written next to the chlorine feed point : (chlorine feed rate, lb / day) = (flowrate, MGD) X (dose, mg / L) x (8.34). If this formula is correct, then what should the chlorine feed rate to be in pounds per day (lb / day) if the desired dose is 2 mg / L. (c) Prove by calculations that the constant 8.34 in the formula next to the chlorine feed point is correct. Let 1 US-gallon = 3.78541 L and 1 mg = 0.0000022046 pound.

1 Answers  


SSR meanig

1 Answers  


What does the catalystic converter on an automobile do?

3 Answers  


What are some guidelines for sizing a psv for a fire scenario on a vessel in a refinery service?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)