Give open excavation details of Building.
Answers were Sorted based on User's Feedback
Answer / muzammil khan
The excovation of any building depends
upon its nature and its location.
and it is also goverened by the type of soil
and the availibility of equipments.
Based on the above parameters we can
prepare the excovation plan.
| Is This Answer Correct ? | 3 Yes | 0 No |
What is the distance between railway tracks?
what IS Code used for TOR & TMT steel bar
6 Answers L&T, Lokhandwala Construction,
What is the maximum distance between the stirrups?
what is the shuttering normal clear cover for footings, walls, beams & columnms
what radial pressure, the NP2 class rcc pipe can sustain?
Difference between lateral ties and stirrups?
which I.S. code shown wastage in structural steel
why we leave expansion joint between to complex
which type of test carrying on the cement & why
Rate of plasting per sq.ft...?
Why we stop the concrete in 1/3 rd of span length
if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)