Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to select cable size for three phase?



how to select cable size for three phase?..

Answer / vijendra joglekar

Depends upon the load & rating of the particular equipment.

Is This Answer Correct ?    16 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

Re: What do you mean by Power factor of a generator? Power factor purely depends on the load (wether inductive, reactive or unity) then what does the Power factor mentioned on the generator nameplate means?

2 Answers  


Difference B/W A/C & D/C Motors..?

10 Answers   Toyota,


what is the function of CRGO in a Transformer?

6 Answers  


how to set earth fault relay

1 Answers  


hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.

0 Answers   Hyundai,


I am looking for LV CT test. To check the polarity of the CT only. Can you suggest any supplier. Different companies are offering CT/PT Tester which is expensive. Thanks

2 Answers  


What is meant by term Back to back in HVDC transmission?

1 Answers   SSC,


how many types of transformer.

3 Answers   Technocrats,


operation of protection relay watchdog contact?

0 Answers   L&T,


we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?

0 Answers   Siemens,


How to do bus bar short circuit calculation for 230KV/11kv, 60 MVA Substation?

0 Answers   ABB,


what is the avr

6 Answers   ArcelorMittal, Heidelberge Cement,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)