What is the type of testing that you apply for maintenance
phase in V-Model
wht is the diff b/w funtional testing and integration testing
What you will do during the first day of job?
Entry and Exit Ceiteria for System Testing?
You are given two scenarios to test. Scenario 1 has only one terminal for entry and processing whereas scenario 2 has several terminals where the data input can be made. Assuming that the processing work is the same, what would be the specific tests that you would perform in Scenario 2, which you would not carry on Scenario 1?
Relative to other technical groups in the company? Relative to your staff?
What is defect life cycle/
What is Changing requirement?
test cases on orange hrm(( this is human resourse management system)
what exactly done parallely in v-model with verification.
write four critical test cases for logout operation?
diff b/w project based testing and product based testing?
1. when to start and stop testing ?