how to find hardness of water?why it should be determined?
how many binding wire can be required for 1 metric tonne steel?
what ratio of cement and sand we used for making cover
Time required for curing of wall tiles before fixing
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
how much M-25 steel reinforcement per cubic meter in commercial building as per IS code
what will be the grade of concrete for PCC having ratio 1:4:8?
Why we are not provide bar in the centre of the column and bar?
how much to get of BRC lapping in full yield and half yield ?
What is the cost difference between site mix and ready mix concrete per cubic meter
whate the size of bricks are avalable at site
what is the difference between NP2 Class and NP3 Class RCC Hume pipes
what is bending moment?