sir,in our plant we r using SATEC PM172E power reading
meeters in HT panel side it is monitoring the MB data smart
viewer(sever).but last one week we did not get readings
inthe server only available in meeter.tell me how
communicate meter and server. and also what steps we take
for checking.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

what is the speed of a turbine in an hydroelectric power station and how many poles does it have...?

1 Answers  


why generator and t/f ratings given in kva & motor rating is in KW?

6 Answers  


I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.

0 Answers  


For a load of 40HP induction motor.what will be size of Armoured copper cable require to connect the motor to starter in Star-Delta?

1 Answers   CG,


what is the difference between the 94 lockout relay and 86 lock out relay. I have noticed that the 94 lockout relay is activated when the distance realy is activated and 86 is activated when the 87T differential is activated. but why can't the same lockouts be used for both the protection schemes

10 Answers   ABB,






heat can flow from a body at low temperature to a body at higher temperature only when ........ is supplied from an external source A). Voltage B). Current C). work D). Mass

7 Answers   BMRCL,


What is the difference btwn grounding and earthing?

11 Answers   HAL,


a solar energy installation utilizes a three phase bridge converter to feed energy into power system through a transformer of 400v/400v.the energy is collected in a bank of 400v battery and is connected to converter through a large filter choke of resistance 10ohms.1.the maximum current through the battrey will be.2.the kva rating of the input transformer is.

1 Answers   GATE,


How to Calculate 11 KV Side Cable size of a 250 KVA Oil cooled transformer

2 Answers  


what is the difference between OSR and BUCHHOLZ relay of transformer?

1 Answers   Bhushan Power Steel,


what is the differebt between ac and dc fuse?

0 Answers   IBM,


what happen when dc supply is given to the transformer

9 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)