Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate cost for MS plate shuttering
(show calculation/assumptions)

Answers were Sorted based on User's Feedback



how to calculate cost for MS plate shuttering (show calculation/assumptions)..

Answer / prashanth

Assume that the shuttering sheet size is 3'X2'

Sheet thickness of 6mm.
Side angle is of 25x25x3mm.
Take a lumsum for welding.
Tools & Planks.
Logistics.
Tax.
Profit.

Is This Answer Correct ?    24 Yes 5 No

how to calculate cost for MS plate shuttering (show calculation/assumptions)..

Answer / jeet

if you want to calculate the amount of per kg.
of 40mmx4'x8'
1.22x2.44x40mm(thikness)x7.85=weight
amount/weight=rate per kg

Is This Answer Correct ?    8 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

door and window wood work calculations and different methods

0 Answers   APPSC,


HOW WE CALCULATE OR FIND OUT THE DEGREE OF FREEDOM IN A SIMLY SUPPORTED BEAM? IF THERE IS HINGE THEN HOW? & ALSO IN A PORTAL FRAME? PLEASE GIVE A EXAMPLE FOR EACH QUESTION.

1 Answers   CCCL, PSCI,


what are the ffactors you considered choosing the course?

0 Answers  


How much quantity a carpenter can do in a day

1 Answers  


How to construct a water sump in a rocky soil?

0 Answers  


how we control the temperature during concreting ?

4 Answers  


Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an example.

9 Answers   JTP, L&T,


what is meant by pqc

2 Answers   APCO, Sunil Hitech Engineers,


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

0 Answers  


How many binding wire is use in arrangement of 25mt steel

2 Answers  


how much binding wire required per tonne slab beam columns

5 Answers   GMR,


what is the density of compacted earth and jamuna sand

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)