Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answers were Sorted based on User's Feedback



how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / jitender kumar mishra

you mixing the mixer machine or baching plant

Is This Answer Correct ?    3 Yes 1 No

how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / akbar khan

if you tell about both in this context,it will be highly
appreciated.

Is This Answer Correct ?    0 Yes 0 No

how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / vasanth

Skilled labour 1.5 m3, Un skilled .7m3

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

how many AAC blocks of size 600*200*225 mm are required for 1 cu.m of area

1 Answers  


i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula

1 Answers  


9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement

8 Answers   L&T,


How to arrive d*d/162 , for finding the kg per meter , wt of steel

0 Answers  


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

0 Answers   L&T,


I've one slab of 24m x 43m. How to calculate required steel For this slab.

5 Answers   Reliance,


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

0 Answers   L&T,


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

0 Answers  


differance bet QA & Qc

1 Answers  


The point of contraflexure occurs in

10 Answers  


What is a MIS report?

1 Answers   NCC,


Exterior Joints,define

0 Answers   Saudi Oger,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)