how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answers were Sorted based on User's Feedback



how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / jitender kumar mishra

you mixing the mixer machine or baching plant

Is This Answer Correct ?    3 Yes 1 No

how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / akbar khan

if you tell about both in this context,it will be highly
appreciated.

Is This Answer Correct ?    0 Yes 0 No

how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)..

Answer / vasanth

Skilled labour 1.5 m3, Un skilled .7m3

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

How to calculate the number of reinforcing bars in a slab

6 Answers   Aldowin Industries, NBCC, THDC,


rate analysis for cement pointing 1:4 , for 100 sq m

0 Answers  


what is the coefficient for running feet to cft coversion both area and price

0 Answers  


How much quantity water should be placed in one cubic meter area?

0 Answers  


How to build the floor to ceiling bookcase?

0 Answers  






What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete

1 Answers   ECR, RRB, Si Precision Moulds,


residential projects,structural.

0 Answers   Ambuja, KBR, Saudi Aramco Shell Refinery Company SASREF,


What is the average density of soil?

0 Answers  


how we can find sieve #4 is 4.75mm?

0 Answers  


Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand

2 Answers  


five benefits of using standard terminology in the measurement process

0 Answers  


# 1. Size of slit content in sand. # 2. Gravity of sand # 3. Water observation capacity of sand. # 4. minimum crushing Strength of sand.

1 Answers   Brigade,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)