When auditing the proposed acquisition of a new computer
system, the IS auditor should FIRST establish that:

A. a clear business case has been approved by management.

B. corporate security standards will be met.

C. users will be involved in the implementation plan.

D. the new system will meet all required user functionality.

Answers were Sorted based on User's Feedback



When auditing the proposed acquisition of a new computer system, the IS auditor should FIRST establ..

Answer / guest

Answer: A

The first concern of the IS auditor should be to establish
that the proposal meets the needs of the business, and this
should be established by a clear business case. Although
compliance with security standards is essential, as are
meeting the needs of the users and having users involved in
the implementation process, it is too early in the
procurement process for these to be the IS auditor's first
concern.

Is This Answer Correct ?    8 Yes 1 No

When auditing the proposed acquisition of a new computer system, the IS auditor should FIRST establ..

Answer / kasturi

D

Since this is a proposed acquisition, the approval of
management will not be in place yet. Hence D is the best option

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More CISA Certification Interview Questions

Which of the ISO/OSI model layers provides for routing packets between nodes? A. Data link B. Network C. Transport D. Session

1 Answers   Network,


The secure socket layer (SSL) protocol addresses the confidentiality of a message through: A. symmetric encryption. B. message authentication code. C. hash function. D. digital signature certificates.

2 Answers  


The security level of a private key system depends on the number of: A. encryption key bits. B. messages sent. C. keys. D. channels used.

1 Answers  


Which of the following pairs of functions should not be combined to provide proper segregation of duties? A. Tape librarian and computer operator B. Application programming and data entry C. Systems analyst and database administrator D. Security administrator and quality assurance

3 Answers  


A company has implemented a new client-server enterprise resource planning (ERP) system. Local branches transmit customer orders to a central manufacturing facility. Which of the following would BEST ensure that the orders are entered accurately and the corresponding products are produced? A. Verifying production to customer orders B. Logging all customer orders in the ERP system C. Using hash totals in the order transmitting process D. Approving (production supervisor) orders prior to production

1 Answers  






Which of the following concerns associated with the World Wide Web would be addressed by a firewall? A. Unauthorized access from outside the organization B. Unauthorized access from within the organization C. A delay in Internet connectivity D. A delay in downloading using file transfer protocol (FTP)

2 Answers  


Which of the following functions, if combined, would be the GREATEST risk to an organization? A. Systems analyst and database administrator B. Quality assurance and computer operator C. Tape librarian and data entry clerk D. Application programmer and tape librarian

2 Answers  


In a public key infrastructure (PKI), the authority responsible for the identification and authentication of an applicant for a digital certificate (i.e., certificate subjects) is the: A. registration authority (RA). B. issuing certification authority (CA). C. subject CA. D. policy management authority.

1 Answers  


As a result of a business process reengineering (BPR) project: A. an IS auditor would be concerned with the key controls that existed in the prior business process and not those in the new process. B. system processes are automated in such a way that there are more manual interventions and manual controls. C. the newly designed business processes usually do not involve changes in the way(s) of doing business. D. advantages usually are realized when the reengineering process appropriately suits the business and risk.

1 Answers  


The window of time recovery of information processing capabilities is based on the: A. criticality of the processes affected. B. quality of the data to be processed. C. nature of the disaster. D. applications that are mainframe based.

1 Answers  


In planning a software development project, which of the following is the MOST difficult to determine? A. Project slack times B. The project's critical path C. Time and resource requirements for individual tasks D. Relationships that preclude the start of an activity before others are complete

1 Answers  


Which of the following hardware devices relieves the central computer from performing network control, format conversion and message handling tasks? A. Spool B. Cluster controller C. Protocol converter D. Front end processor

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)